✅ Steps in Risk Assessment (As per ICH Q9)
✅ Steps in Risk Assessment (As per ICH Q9)
1. Risk Identification
-
What could go wrong?
-
Identify potential hazards, failure points, or sources of variability
๐ Example: "There is a risk of cross-contamination during tablet coating."
2. Risk Analysis
-
Assess the severity, probability, and detectability of the identified risk.
Parameter | Description |
---|---|
Severity (S) | Impact on product quality/patient |
Probability (P) | Likelihood of occurrence |
Detectability (D) | Likelihood of detecting before release |
๐ Tools often used: FMEA, Ishikawa (fishbone), 5 Whys, Hazard Analysis
3. Risk Evaluation
-
Combine scores to prioritize risks (e.g., using a Risk Priority Number – RPN):
-
Set thresholds:
-
High risk (e.g., RPN > 100) → needs immediate action
-
Medium risk → requires mitigation
-
Low risk → monitor or accept
-
4. Risk Control
-
Decide on actions to eliminate or reduce risk:
-
Corrective actions
-
Process redesign
-
Preventive maintenance
-
SOP changes
-
Additional controls or alarms
-
5. Risk Review
-
Monitor over time
-
Reassess if:
-
A change occurs
-
A deviation or complaint arises
-
New data is available
-
๐งพ Output of Risk Assessment:
-
Risk assessment report (RA form)
-
Mitigation plan (if needed)
-
Updated procedures or specifications
-
Documentation in validation protocol, change control, or investigation
๐ Example – Simple Risk Matrix
Low Impact | Medium Impact | High Impact | |
---|---|---|---|
Low Likelihood | Low Risk | Medium Risk | High Risk |
Medium Likelihood | Medium Risk | High Risk | High Risk |
High Likelihood | High Risk | High Risk | High Risk |
Comments
Post a Comment